Tuesday , May 26 2020
Home / Engineering / SOP (page 5)

SOP

MAINTENANCE OF CHILLED WATER LINE

OBJECTIVE                                   To lay down a procedure for maintenance of Chilled Water Line SCOPE This SOP is applicable to Chilled Water Line.                        RESPONSIBILITY Technical Supervisor / Engineer                    ACCOUNTABILITY Sr.Executive / Manager                                 PROCEDURE Daily Maintenance Give the chemical dosing of 2902 …

Read More »

Sanitization of Purified Water Generation and Distribution System

Objective:To lay down a procedure for Sanitization of Purified Water Generation and Distribution system. Scope:This Standard Operating Procedure is applicable to the formulation plant. Make/Capacity and EQ. ID. No. are as follows:- Sr. No.                         Make                           Capacity                      EQ. ID. No. 1.0                   …

Read More »

MAINTENANCE OF INGERSOLL RAND AIR COMPRESSOR, MODEL IHE-5-NL-2

OBJECTIVE          To lay down a procedure for Maintenance of Air compressor SCOPE This SOP is applicable to Air compressor. RESPONSIBILITY Technical Supervisor / Engineer        ACCOUNTABILITY Sr.Executive / Manager                     PROCEDURE Daily Maintenance Check and ensure oil level as per the mark given on the view glass. Clean the outer surface of …

Read More »

MAINTENANCE OF BOREWELL PUMP

OBJECTIVE            To lay down a procedure for Maintenance of Bore well Pump                   SCOPE This SOP is applicable to bore well Pump             RESPONSIBILITY Technical Supervisor / Engineer        ACCOUNTABILITY Sr.Executive / Manager                     PROCEDURE Monthly Maintenance Clean the contactors with CTC / CRC Ensure the …

Read More »

MAINTENANCE OF AIR HANDLING UNIT MAKE: BLUE STAR

OBJECTIVE                       To lay down a procedure for Maintenance of Air Handling Unit SCOPE This SOP is applicable to Air Handling Unit. RESPONSIBILITY Technical Supervisor / Engineer        ACCOUNTABILITY Sr.Executive / Manager                     PROCEDURE Daily Maintenance Check and ensure that the difference between inlet and outlet temperature of chilled water is within the …

Read More »

CLEANING OF AIR HANDLING UNIT (AHU) FILTERS

OBJECTIVE To lay down a procedure for Cleaning of Air Handling Unit (AHU) filters  20 Micron, 10 Micron , 5 Micron  SCOPE This SOP is applicable to cleaning of Air Handling Unit (AHU) filters 20 Micron , 10 Micron, 5 Micron . RESPONSIBILITY  Technical Supervisor / Engineer ACCOUNTABILITY  Manager  PROCEDURE …

Read More »

Performance Qualification Protocol. Bung washer

OBJECTIVE To establish documented evidence which will provide a High degree of assurance and reliability about the performance of the BUNG WASHING MACHINE. To verify the Rubber stopper washing process is capable of consistently and reliably removing Particulate matter contaminants, such as dust, lint, fibres etc., Bacterial Endotoxins, from the …

Read More »

Performance Qualification Protocol. Vial washing machine

OBJECTIVE To establish documented evidence which will provide a High degree of assurance and reliability about the performance of the VERTICAL ROTARY VIAL WASHING MACHINE. To verify the vial washing process is capable of consistently and reliably producing appropriate washing of different types of vials at different speeds encountered in …

Read More »

Hydro Testing Procedure for Purified Water Distribution Loop and Purified Water Storage Tank

Hydro Testing Procedure for Purified Water Distribution Loop Objective : To ensure that the Purified Water Distribution Piping is Leakage proof from TC joints & Orbital Weld joints. Scope :Applicable for Hydro Testing of Purified Water Distribution Loop Procedure : Fill the Purified Water Distribution piping loop completely with Purified …

Read More »

Passivation and Cleaning Procedure Purified Water Distribution Loop

Objective : To ensure that the Purified Water Distribution System is Chemically cleaned. Scope :Applicable for Passivation and Cleaning of Purified Water Distribution Loop Procedure : Fill the Purified Water Storage Tank till the Half Level.  Ensure Suction & Discharge valve of pump are open and all user points & sampling …

Read More »