MAINTENANCE OF BOREWELL PUMP MAKE: KSB, MODEL: UMA-C150

  • OBJECTIVE           
  • To lay down a procedure for Maintenance of Bore well Pump                  
  • SCOPE
  • This SOP is applicable to bore well Pump, Capacity: 34 m3/HR.        
  • RESPONSIBILITY
  • Technical Supervisor / Engineer       
  • ACCOUNTABILITY
  • Sr.Executive / Manager                    
  • PROCEDURE
  • Monthly Maintenance
  • Clean the contactors with CTC / CRC.
  • Ensure the pump load should be in between 7.5-10 Amps
  • Ensure no water leakages from pump and pipe lines .
  • Check and ensure cable glands are tight.
  • Ensure the earthing, which is connected to the pump, should also be connected to earth grid by checking with earth megger.
  • Clean the control panel with air blower.
  • Put a Tick mark (Ö) in Monthly Check Sheet after completion of each activity. If it is not O.K put a cross (X) in Monthly Check Sheet indicating the reason in remarks column.
  • Immediately inform to the concern superior if it is not O.K (X) and take necessary corrective action as per the advice.
  • Any such deviations should be maintained in the Machine History Cord along with necessary corrective action and its complaints there of.
  • Yearly Maintenance
  • Check and replace the valves if valves are not functioning
  • Calibrate the pressure gauges.
  • Overhaul the pump.
  • Put a Tick mark (Ö) in Yearly Check Sheet.
  • Forms and Records (Annexures)
  • Not Applicable
  • Distribution
  • Master copy –  Quality Assurance
  • Controlled copies- Quality Assurance, Production, Quality Control
  • History
    Date Revision Number Reason for Revision

     

    00 New SOP